Progress on Shopping Centre Redevelopment

There has been a manor leap in progress on the the SQ1 Centre, a redevelopment of the existing Brunswick Centre, as space is being offered to prospective retailers for occupation in 2027.

Agents Saville, Leeds office, state “Offering over 90,000 sq ft of high-quality leisure space across three floors, and equipped with cutting edge SQ1 is set to spearhead Scarborough’s rejuvenation into the premier Yorkshire coastal destination.”

It was previously announced that a milestone was reached when Odeon Luxe signed as operator of the seven screen cinema complex.  Now the search is on for a blend of top national brands alongside emerging regional and indie food operators to occupy the rest of the complex.

Construction in due to commence shortly on what will be an important step for Scarborough.

Details from Saville:

https://search.savills.com/property-detail/gb1133l236892